Time and Cost Overrun in Construction Projects
 Factors that contribute to Time and Cost Overrun in Construction Projects include:
- 🕵ï¸Poor planning and estimation: Not accurately estimating project costs and timelines from the beginning sets the stage for overruns.
- 📈Design changes:
Frequent modifications to the design after construction begins can cause delays and cost increases. - 🙅Poor Project Management: Ineffective project management can result in delays and cost overruns. This includes issues like lack of coordination, poor communication, and failure to anticipate and address potential problems
- ✨Changes in Scope: Changes in project scope during construction can significantly impact time and cost. Frequent changes can lead to rework, delays, and additional expenses.
- 👮Regulatory and Permitting Delays: Compliance with regulatory requirements and obtaining necessary permits can sometimes cause significant delays in construction projects.
- 🧲Unforeseen Site Conditions: Construction projects often encounter unexpected challenges such as hidden underground utilities, poor soil conditions, or adverse weather conditions. These unforeseen circumstances can disrupt the project schedule and inflate costs.
- 👉Inadequate Resource Allocation: Insufficient/poor allocation of resources, including machineries, manpower, equipment, and materials, can cause delays and increase costs. Proper resource planning and management are crucial to ensure smooth project execution.
- 🕹ï¸Weak contract Conditions: In absence of proper contract clauses, ambiguities or disputes in project contracts can lead to delays and cost overruns. Clear and well-defined contracts, including detailed specifications and project timelines, are essential to mitigate such issues.
- 🦺Lack of Skilled Manpower: Shortages of skilled manpower in the construction industry can result in project delays and increased costs. It is essential to ensure adequate skilled manpower with the necessary expertise is available for the project.
- ðŸŽUnforseen Risks: Construction sites are prone to unforeseen risks and hazards, such as accidents, equipment failures, or natural disasters. These events can disrupt the project schedule and escalate costs.
     By acknowledging and addressing all above factors in a timely manner, will minimize cost Overrun up to a great extent.ðŸ¤ðŸš§âðŸŽðŸ‘